Jump to content

Robot Bid definition


A2003

Recommended Posts

For 3 Bid definition says: Preemptive. 7+C, 5+8421hcp in C, 6-13 total points.

This similar bid definition is for 3, 3, 3 also.

There is something wrong in HCP.

 

For 4 bid definition: Preemptive. 7+C, 9- HCP in C, 3+ total points.

For 4 same definition.

Should total points be higher than HCP?

Link to comment
Share on other sites

Total points are HCP + 3 for a void, 2 for a singleton, 1 for a doubleton.

 

8421 Points are 8 for an Ace, 4 for a King, etc., so 5+ means KJ or better (with a lonely ace counting as better).

 

9- HCP means 9 or less.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...